Logistics-park progress program

Monthly construction-progress mapping across a multi-building logistics park: orthomosaic, time-lapse frames, and earthwork comparisons for the GC's owner review. Control and measurement treatment are defined by project.

Monthly
CADENCE
Ortho + volumes
PER CYCLE
Owner review
REPORTING

On a multi-month build, the owner report is only as strong as its evidence. In this representative scenario, the full park is captured on a fixed monthly window; recurring captures provide a consistent visual record for the owner's progress review, with orthomosaics, time-lapse frames, and earthwork comparisons included when the capture, control, and surface methods are suitable.

The quoted scope would define the comparison plan, measurement limits, site changes, occlusions, cadence, and reporting format. The record may inform discussion, but it does not guarantee dispute resolution, payment approval, schedule performance, or completeness.

Scope & deliverables.

Capture

Fixed monthly window · full-site PPK grid · repeat flight plan for cycle-to-cycle comparison

Deliverables

Orthomosaic · earthwork volumes with cycle change · time-lapse frame set · owner-review package

Cadence

Monthly through the build · extra captures at milestone pours or claims

Method boundary

Comparison assumptions, control, surface treatment, exclusions, and permitted use stated for the project

How accuracy was held.

Produced to ASPRS. Produced to the ASPRS workflow with PPK positioning, resolution stated per cycle. Where a claim or a pay-app dispute needs it, a checkpoint-tested cycle is flown and documented. ASPRS wording does not establish payment, claim, schedule, or contractual outcomes.

The ASPRS ladder, explained

Delivery commitments.

Standard-scope deliverables are typically available in the portal within 24 hours of flight; larger, survey-tested, or multisensor scopes receive quoted timeline.
Free reprocessing, revision, and re-delivery for the life of the project, within original scope.
Data is processed in the field and checked for completeness before demobilization (coverage, overlap, control residuals); final validation follows the stated delivery method.

Scope one like it.

15-minute reply. Fixed price. Lifetime data support.

Get a Free Quote All illustrative projects
ILLUSTRATIVE ENGAGEMENT PROFILE · CLIENT NAMES WITHHELD · IMAGERY IS REPRESENTATIVE UNTIL PROJECT IMAGERY REPLACES IT